Skip to content
Advanced Infrastructure Systems
Home
About
Products
FAQs
News & Resources
Contact
Get in touchGet in touch

Case Studies

EasyPIT® ULTRA Access Chambers | FORTIS® Multiple Duct Cable ProtectionHS2 Great Worth Green TunnelGreatworth Green Tunnel is the longest green tunnel on the HS2 route, stretching for 1.7 miles through West Northamptonshire.HS2 logoSite operatives installing access chambers at the HS2 Greatworth Green Tunnel
EasyPIT® ULTRA | Ductile Iron | Fabricated SteelSwansea North Sub StationThe Swansea North 400kV Substation, commissioned by National Grid, is a state-of-the-art facility developed to transfer demand from the existing Swansea North 275kV substation.Extra MSA Group logoAerial view of the Swansea North 400kV substation site
EasyPIT® CONNECT | EasyGRIP®Extra MSA Group — M62Advanced Infrastructure supplied EasyPIT CONNECT access chambers and EasyGRIP composite access covers at Hartshead Moor Services, M62 Motorway.Extra MSA Group logoExtra MSA services building at Hartshead Moor on the M62
EasyPIT® ULTRA | EasyGRIP®Sellindge Sub StationWe supplied our EasyPIT ULTRA chambers to support infrastructure works at National Grid's Sellindge substation, providing access chamber systems for electricity transmission infrastructure.Extra MSA Group logoNational Grid Sellindge substation site
EasyPIT® ULTRA | ecoNOMY®SPARK WalsallAIS provided Hannon Brothers with a dual-system infrastructure solution for the £100 million brownfield regeneration of the SPARK Walsall hub. The objective was to supply D400-rated, low-carbon access chambers to meet stringent Net Zero and BREEAM standards.SPARK Walsall logoAerial view of the SPARK Walsall regeneration development
EasyPIT® ULTRA | EasyGRIP®Strensham Sewage Treatment WorksThe Strensham Water Treatment Works is currently undergoing a significant upgrade project managed by Severn Trent Water, with Coffey Construction UK serving as a key contractor.Extra MSA Group logoAerial view of Strensham water treatment works
Advanced Infrastructure Systems

Stay connected

Join our newsletter for product launches, project news and technical resources — straight to your inbox.

Links

Home

About

Products

Blog

News & Resources

FAQs

Contact

Privacy Policy

Contact info

Shropshire House,
Hortonwood 1,
Telford,
Shropshire,
TF1 7GN,
United Kingdom

+44(0)1952 504288

sales@advancedinfrastructure.com

Working hours

Monday to Thursday:
8:30am - 5:00pm
Friday:
8:30am - 2:30pm
Saturday & Sunday: Closed

Designed by Aquilon Tech.

LinkedIn