News & Resources

Site operatives installing access chambers at the HS2 Greatworth Green TunnelEasyPIT® ULTRA Access Chambers | FORTIS® Multiple Duct Cable Protection

HS2 Great Worth Green Tunnel

Greatworth Green Tunnel is the longest green tunnel on the HS2 route, stretching for 1.7 miles through West Northamptonshire.

Aerial view of the Swansea North 400kV substation siteEasyPIT® ULTRA | Ductile Iron | Fabricated Steel

Swansea North Sub Station

The Swansea North 400kV Substation, commissioned by National Grid, is a state-of-the-art facility developed to transfer demand from the existing Swansea North 275kV substation.

Extra MSA services building at Hartshead Moor on the M62EasyPIT® CONNECT | EasyGRIP®

Extra MSA Group — M62

Advanced Infrastructure supplied EasyPIT CONNECT access chambers and EasyGRIP composite access covers at Hartshead Moor Services, M62 Motorway.

National Grid Sellindge substation siteEasyPIT® ULTRA | EasyGRIP®

Sellindge Sub Station

We supplied our EasyPIT ULTRA chambers to support infrastructure works at National Grid's Sellindge substation, providing access chamber systems for electricity transmission infrastructure.

Aerial view of the SPARK Walsall regeneration developmentEasyPIT® ULTRA | ecoNOMY®

SPARK Walsall

AIS provided Hannon Brothers with a dual-system infrastructure solution for the £100 million brownfield regeneration of the SPARK Walsall hub. The objective was to supply D400-rated, low-carbon access chambers to meet stringent Net Zero and BREEAM standards.

Aerial view of Strensham water treatment worksEasyPIT® ULTRA | EasyGRIP®

Strensham Sewage Treatment Works

The Strensham Water Treatment Works is currently undergoing a significant upgrade project managed by Severn Trent Water, with Coffey Construction UK serving as a key contractor.

Amazon delivery station building in CarlisleEasyPIT® ULTRA | Fabricated Steel

Amazon Delivery Station — Carlisle

40t

Advanced Infrastructure supplied the EasyPIT® ULTRA access chamber system together with bespoke fabricated steel access covers to the new Amazon Delivery Station in Carlisle, Cumbria.

Container ship berthed at DP World London GatewayEasyPIT® ULTRA | EasyGRIP®

DP World London Gateway

£1.5bn

Advanced Infrastructure supplied the EasyPIT® ULTRA chamber system and EasyGRIP® composite covers as part of an ongoing supply contract at DP World's London Gateway — the largest new port project in Britain.

Aerial view of Drayton sewage treatment worksEasyPIT® ULTRA | Ductile Iron

Drayton Sewage Treatment Works

1200×1200

Advanced Infrastructure supplied the EasyPIT® ULTRA chamber system alongside ductile iron access covers and frames to the infrastructure works at Drayton Sewage Treatment Works, undertaken by Tilbury Douglas on behalf of Thames Water.

The Barn amenities building at the University of NottinghamEasyPIT® ULTRA

Nottingham University

Advanced supplied its EasyPIT® ULTRA access chamber system to the University of Nottingham's new £9m amenities building, 'The Barn'.

Sizewell C site entrance signEasyPIT® ULTRA

Sizewell C

Advanced supplied its EasyPIT® ULTRA access chamber system to Sizewell C, the new twin-reactor nuclear power station on the Suffolk coast.

Aerial view of HMP Channings Wood in DevonEasyPIT® ULTRA | Ductile Iron

HMP Channings Wood

Advanced supplied oversized D400 access chambers and ductile iron covers and frames for the expansion of HMP Channings Wood in Devon.